Piping


16” Water Main Relocation (05/2011)
City of Port St. Lucie, Utilities Department, 121 SW Port St. Lucie Blvd, Port St. Lucie, FL 34984  ::  Dave Koeppen, CM
Approximately 180 lf of PVC Water Main, fittings, Butterfly Valve, line-stop and connections to extg 16” Main. Restoration required.

Reclaimed Water Main – Area 11B (8/2011)
City of Delray Beach, 434 S Swinton Avenue, Delray Beach, FL 33444  ::  Rafael Ballestero
Installation of over 8000 lf of 4”, 6”, 10” PVC Reclaimed Water Mains and RWM Services throughout residential neighborhoods. RWM bridge crossing included. Also includes water main replacement, bridge crossing and pipe bursting. Also includes Force main replacement including directional drill. Construction requires restoration including micro-surfacing.

MLK Reclaimed Water Main (4/2011)
City of Delray Beach, 434 S Swinton Ave, Delray Beach, FL :: GC: Brang Construction Inc., 4300 Oak Circle, Boca Raton, FL :: Matt Wolf, PM
Installation of new +/- 4200lf of 10” and 6” Reclaimed Water Main including services to properties and roadway restoration.

Central District Flushing Water System Improvements – Phase 1 (6/2011)
Miami-Dade Water & Sewer, 3071 SW 38th Avenue, Miami, FL 33146  ::  Luis Rojas, PM
Installation of new and replacement of existing Flushing Water Piping below ground and within pipe galleries of existing Sanitary Sewer Treatment Plant.


COMPLETED PROJECTS


Area 11A Reclaimed Water System – Contract 2 (July 30, 2009)
City of Delray Beach, 434 S Swinton Avenue, Delray Beach, FL 33444
Installation of 18” Reclaimed Water Main open cut and directional drill in downtown Delray Beach.

Project: Sewer Area 4, Basins B &C (April, 2008)
City of Ft. Lauderdale Waterworks, 200 N Andrews Ave, 3rd Floor, Ft. Lauderdale, FL 33301
Installation of (18) new sanitary manholes, over 4100 lf of sanitary main and over 5000 lf of 3” force main, asphalt restoration down two dead end streets.

Shady Banks WM Replacement (June 1, 2007)
City of Ft. Lauderdale Waterworks, 200 N Andrews Ave, 3rd Floor, Ft. Lauderdale, FL 33301
Installation of (3) new FH, and +/- 1000lf of 6” Water Main<

Country Oaks Lane Improvements (November, 2005)
Palm Beach County, 160 Australian Avenue, Suite 405, West Palm Beach, Florida 33406
Sewage Pump Station, Sanitary Sewer and Watermain and Storm sewer and asphalt paving down dead end street in very tight conditions.

North Miami Beach Alley Reconstruction of Alley, Phase 6 – 9 (May, 2006)
City of North Miami Beach, 17011 NE 19 Avenue, North Miami Beach, Fl 33162-3100
Installation of 2” HDPE water main and services in alleyways on six streets. Also included new asphalt in alleys.

Transite Water Main Replacement (Completed August, 2006)
City of West Palm Beach, 200 2nd Street, West Palm Beach, FL 33402
Replacement of transite water pipe with ductile iron in residential community.

6th Street West of Dixie Highway Sanitary Sewer (February 2004)
City of West Palm Beach, 1000 45th Street, Suite 15, West Palm Beach, Fl 33407
Installation of sanitary sewer pipes, manholes, sanitary lateral services and all pavement restoration on 6th Street west of Dixie Highway.

Tropic Vista Water Distribution System (May 2005)
Village of Tequesta, 250 Tequesta Drive, Suite 300, Tequesta, Fl 33469
Installation of Water Distribution System

Municipal Golf Course Reclaimed Watermain (June 2003)
City of Delray Beach, Environmental Services Dept., 434 South Swinton Ave., Delray Beach, Florida 33444
Install 24” & 8” watermain across City golf course including 2 valve vaults for 8” mag meters and 3 pig launch devices.

Contract B-Raw Watermain (January 21, 2000)
City of Lake Worth Utilities, 1900 Second Avenue North, Lake Worth, Fl 33461-4298
Construct New raw water main and replace potable wells number 3 and number 14.

Sawgrass Wellheads and Raw Water Main – Phase II (October 1998)
City of Sunrise, 10770 West Oakland Park Blvd, Sunrise, Florida 33351
Installation of submersible pumps, 18” column piping, poured in place concrete vaults, mechanical piping and valves, electrical controls and instrumentation and control panels. Installation of 5,600 lf of 30 & 36 inch DIP water main.

Intracoastal Waterway Force Main Crossing (>February 1999)
City of Pompano Beach
Directional Bore, 660 ft. of 24” PE pipe under the intracoastal waterway with connections at each end. Also to include two 36” jack and bores under major State Highway.

Construction of Gravity Sewer Lines (August 31, 1998)
City of Sunrise
Install 555 ft. of 8”sanitary sewer lines and 42 service laterals. Install cut in manhole with outside drop, build one outside drop on existing manhole and install two new manholes.

Englewood Manor (February 1997)
Palm Beach County Utilites
Installation of 6”, 8” & 12” Watermain

Construction of Six (6) Deep Drainage Wells & Storm Sewer Structures (March 1997)
City of Miami Beach, 1700 Convention Center, Miami Beach, Florida 33139
Install six drainage wells & structures w/storm sewer pipe & inlets.

Utility Improvements at Sunrise Toll Plaza (October 1996)
Florida Dept of Transportation, Turnpike Construction Office, PO Box 17870, Plantation, Florida 33318-7870
Install sanitary sewer main & water line.

Drainage Improvements Village Elementary School (October 1995)
School Board of Broward County, 1700 SW 14th Court, Fort Lauderdale, Florida 33312
Install 15” RCP drainage pipe. 15” exfiltration trench, drainage structure and head wall.

Water Distribution System Improvements (December 1996)
Bal Harbor Village, 655 Ninety Sixth Street, Bal Harbor, Florida 33154
Installation of 8” and 6” watermains, replacement of fifteen (15) fire hydrants and two (2) 12” X 8” T.S.V. and interconnects.

Port Everglades Authority Miscellaneous Apron & Slab Repairs (December 1994)
Port Everglades Authority, 1850 Eller Drive, Fort Lauderdale, Florida 33316
Water line and storm sewer repairs along with concrete slab repairs.