Sanitary Lift and Sewage Pump Stations


Surfside Pump Stations (current)
(Owner)
Construction of (3) stormwater pump stations and (2) sewage lift stations for City of Surfside, FL

Indiantown Road Master Lift Station Rehabilitation Phase 3 (current)
Loxahatchee River District, 2500 Jupiter Park Drive, Jupiter, FL 33458
Lift station rehabilitation.  Demolition of existing concrete and metal structures, cleaning, repair and recoating of wet well walls and ceiling, installation of new FRP walkway and staircase, demo of existing asbestos duct work and access replacement.

Lift Station 801 Rehabilitation (9/2011)
City of Boynton Beach, PO Box 310, Boynton Beach, FL 33425 ::  Anthony Lombardi, PM
Rehab of existing and operating Lift Station. Installing new pump, new duct and louver for extg generator, new concrete slabs on grade, block window and paint interior and exterior of existing electrical room, Electrical modifications to electrical building.

Deerfield Beach LS 14,20 & 64 (6/2011)
City of Deerfield Beach, 401 SW 4th Street, Deerfield Beach, FL  ::  Fred Scott, PM
Rehabilitation of three existing lift stations, change submersible pumps, City furnished control panels, new valve vaults, piping and restoration.

Pompano Beach Lift Sta 21 Replacement (12/2011)
City of Pompano Beach, 1201 NE 3 Avenue, Pompano Beach, FL  ::  Tammy Good, PM
Construction of Lift Station located within Single story 3800 sf building. This project includes auger pilings, cast in place below ground valve vault and pipe trench, sanitary sewer main replacement on DOT roadway, new force main, water main, landscaping, Structural, roofing, plumbing, electrical and various components


COMPLETED PROJECTS


Phase II Systemwide Upgrades PS A-14, A-40, B-9, D-33, D-35, D-36 (February, 2011)
City of Ft. Lauderdale, 200 N Andrews Ave, Ste 300, Ft. Lauderdale, FL 33301
Rehabilitation of (6) existing pump stations requiring bypass pumping, installation of new pumps and control panels, connections to existing mains and site restoration.

Deerfield Beach Lift Sta Rehab Stations #6, #27 and #61 (April 30, 2010)
City of Deerfield Beach, 200 Goolsby Blvd., Deerfield Beach, FL 33442
Rehabilitation of (3) existing pump stations, replacement of pumps, install new valve vaults, bypass pumping required.

Terminal 29 Lift Sta Upgrade (April 1, 2010)
Broward County Public Works, Seaport Engineering & Const Div, 1850 Eller Drive, Ft. Lauderdale, FL 33316-4201
Replacement of existing pump station with new wet well, valve vault, pumps and control panel in Port Everglades, Broward County, FL.

Sanitary Sewer Lift Stations B-3 and 8 Rehabilitation (March 12, 2010)
City of Oakland Park Engineering & Community Dev Dept, 5399 N Dixie Highway, Oakland Park, FL 33334
Rehabilitation of two existing pump stations requiring bypass pumping, installation of new pumps, valve vaults and control panels.

Dania Bch Lift Sta Imprv (March 2, 2009)
City of Dania Beach, 100 Dania Beach Blvd, Dania Beach, FL 33004
Rehabilitation of (4) existing pump stations

Project: Riverside/Victoria (5) Pump Sta (March, 2009)
City of Ft. Lauderdale Waterworks, 200 N Andrews Ave, 3rd Floor, Ft. Lauderdale, FL 33301
Installation of (5) new pump stations in various areas of Ft. Lauderdale

Edgewood Pump Sta Pkg #1 (February, 2009)
City of Ft. Lauderdale Waterworks, 200 N Andrews Ave, 3rd Floor, Ft. Lauderdale, FL 33301
Installation of (3) new lift stations in various locations in Ft. Lauderdale.

Boynton Beach Lift Stations (February, 2009)
City of Boynton Beach, 100 E Boynton Beach Blvd., Boynton Beach, FL 33425 :: Paul Fleming, PMP
Installation of (5) new lift stations in various locations in Boynton Beach.

Septic Area 3, 4 and 5 (August, 2007)
City of Ft. Lauderdale Waterworks, 200 N Andrews Ave, 3rd Floor, Ft. Lauderdale, FL 33301
Installation of 4 new pump stations in various locations in City of Fort Lauderdale.

Group 1 Pump Sta Rehab (October, 2007)
City of Ft. Lauderdale Waterworks, 200 N Andrews Ave., Suite 300, Ft. Lauderdale, FL 33301 :: Walt Schwarz, PE
Installation of (5) new pump Stations throughout the City of Ft. Lauderdale.

Group 2 Pump Sta Rehab (September, 2007)
City of Ft. Lauderdale Waterworks, 200 N Andrews Ave., Suite 300, Ft. Lauderdale, FL 33301 :: Walt Schwarz, PE
Installation of (2) new pump Stations and modifications to (2) existing stations throughout the City of Ft. Lauderdale.

Croissant Park, Basin C (February 26, 2007)
City of Ft. Lauderdale Waterworks, 200 N Andrews Ave, 3rd Floor, Ft. Lauderdale, FL 33301
Installation of 15 Sanitary Manholes and 8”Sewer main.

Country Oaks Lane Improvements (November, 2005)
Palm Beach County, 160 Australian Avenue, Suite 405, West Palm Beach, Florida 33406
Sewage Pump Station, Sanitary Sewer and Watermain and Storm sewer and asphalt paving down dead end street in very tight conditions.

Lift Station #24 Improvements (May 2005)
City of Pompano Beach, P.O. Drawer 1300, Pompano Beach, Fl 33061   ::  Helen Gray
The re-construction of Lift Station #24, furnish and install 1800 linear feet of 6” forcemain, roadway re-surfacing, and the installation of 3500 linear feet of 8” water main.

Seacoast Lift Station No. 21 Force Main Relocation (June 2004)
Seacoast Utility Authority, 4200 Hood Road, Palm Beach Gardens, Fl 33410
Install approximately 2,200 ft 12” force main; 600lf of 20” Directional drill under the Earman river; 24” jack and bore under six lanehighway with wide median., and a new 12’ diameter lift station via tremie method to 30’ depth.

Lift Stations 56A1, 56A2, 56B and 56B1 (November 2002)
Broward County Board of County Commissioners, 115 South Andrews Avenue, Fort Lauderdale, Florida
Rehabilitate lift stations 56A1, 56A2, 56B and 56B1.

D-Basins Pump Station (May 2000)
City of Oakland Park, 3650 N.E. 12th Avenue, Oakland Park, Florida 33334
Construct three lift stations D1, D2, and D4

Lift Stations 23F, 23J & 25B (February 2000)
Broward County Board of County Commissioners, 115 South Andrews Avenue, Fort Lauderdale, Florida
Rehabilitate lift stations 23F, 23J and 25B

Master Pump Station 364 and Force Main (August 2000)
Seacoast Utility Authority, 4200 Hood Road, Palm Beach Gardens, Fl 33400
Construct master pump station, lift station and thirteen thousand feet of 30” force main: four 48” jack and bores; one under I-95, one under the Florida Turnpike, one under Military trail and one under Central Avenue; and one aerial crossing.

Sewer Systems Improvements Pump Station R and Modifications to Pump Stations D & G (July 1997)
City of Key West, Key West, Florida
Install new pump station and rehabilitate two others.

Group 1 Lift Station Rehabilitation (June 11, 1998)
City of Boca Raton
Rehabilitation of Five Pump Stations

Rehabilitation of Lift Stations 20C, 20D & 22A (February 1998)
Broward County, Office of Environmental Engineering
Install new wetwells, new pumping equipment, new valve vaults, new electrical service, tie into force main and new water service.

Lift Station Rehabilitation (February 1998)
City of Delray Beach, Environmental Services, 434 S. Swinton Avenue, Delray Beach, Florida 33444
Rehabilitation of Lift Stations 3, 10, 32, 83, 88 and 105.