Storm Drainage


Reclaimed Water Main – Area 11B (8/2011)
City of Delray Beach, 434 S Swinton Avenue, Delray Beach, FL 33444  ::  Rafael Ballestero
Installation of over 8000 lf of 4”, 6”, 10” PVC Reclaimed Water Mains and RWM Services throughout residential neighborhoods. RWM bridge crossing included. Also includes water main replacement, bridge crossing and pipe bursting. Also includes Force main replacement including directional drill. Construction requires restoration including micro-surfacing.

Design/Build Tamarac Auto Slide Gate System (6/2011)
City of Tamarac, 6011 Nob Hill Road, Tamarac, FL 33321-6200  ::  Alan Lam, Project Manager
In partnership with engineering firm, design and construction of replacement of existing flap gates with automatic slide gate system at (3) existing storm water pump stations within City of Tamarac. Also includes integration to RTU, aluminum decking and fencing.


COMPLETED PROJECTS